In India Combined Consent
is required to be obtained for establishing new projects and for operating
existing projects from the State Pollution Control Board under the Environment
Act 1986 and other relevant acts. For this purpose specific statutory
procedure is required to be followed which includes submission of the
Combined Consent application in the prescribed format to the authorities
along with necessary data/information, documents and consent fee for processing
the application.
| Data/Documents
required for Combined Consent Application: |
- Technical
Data -
1.1) Names of the products and their average production per month
or year.
1.2) Names of raw materials and their average consumption per
month or year separately pertaining to each
product.
1.3) Process Flow chart pertaining to each process and product.
In each process flow chart, please indicate
mass balance (approx.)
and generation rate of gaseous emissions, liquid effluent and
solid waste from
every unit operation of the process. In case
there is no such generation, then please indicate nil.
1.4) Names of consumables and their consumption rate per month
or year such as fuel oil, maintenance
material, viz grease, lubricants,
cotton waste, packing material etc.
1.5) Water consumption rate per day and its approx. usage for
different applications such as domestic and
industrial etc.
1.6) No. of workers and staff shift-wise.
1.7) Sanctioned and connected electric loads.
- Non
Technical Data -
2.1) Name & Address of the Company, its Regd. Office and factory
along with telephone Nos. and fax Nos.
2.2) Names and addresses of Directors of the company and the occupier
of the factory.
- Documents
-
3.1) Site location plan 5 copies
3.2) Plant/Factory layout plan 5 copies
3.3) NOC from the statutory local body or the State Govt. 5 copies
3.4) Feasibility study report on pollution control systems
existing and proposed 5 copies
3.5) Declaration on stamp paper w.r.t. hazardous waste Original
in the prescribed format + 4 copies
3.6) Statement of capital structure on stamp paper Original in
the prescribed format + 4 copies
3.7) Latest combined consent 5 copies
3.8) Air, Noise, Water pollution & Hazardous Waste monitoring
reports 5 copies.
3.9) Water bills for last six months. 5 copies
3.10) Pay Order/DD of the consent fee in favour of State
Pollution Control Board in whose jurisdiction the
project is being
set up or being operated. Original + 4 copies
|
CONSENT
FEES PAYABLE TO ESTABLISH OR TO OPERATE INDUSTRY
as per G. R. No. - ESTT(MPC) 1096/CR-23/96/D-3, dated 02/01/1997
|
| Capital
Investment of the Industry |
Amount
payable |
| More
than 100 Crores |
1,00,00/- |
| Between
50 Crores and 100 Crores |
60,000/-
|
| Between
10 Crores and 50 Crores |
40,000/-
|
| Between
5 crores and 10 Crores |
10,000/-
|
| Between
1 Crore and 5 Crores |
5,000/- |
| Between
60 lakhs and 1 crore |
2,000/- |
| Between
10 Lakhs and 60 lakhs |
1,000/- |
| Below
10 lakhs |
200/-
|
|
|